OEM / ODM PRODUCT DEVELOPMENT

Two paths from brief
to production.

Bring an existing design or a market opportunity. We connect the right development path to an approved production standard.

  • New concepts
  • Existing designs
  • Approved production sample
Compare OEM & ODM
Costume range being reviewed beside sketches and material swatches in a development process visualDEVELOPMENT PROCESS VISUAL
OEM FROM YOUR SPECIFICATION

Your design.
Built to an agreed standard.

We review the supplied specification, reference sample, materials, packing and approval requirements before sampling for production.

Designer sketching animal-inspired costume directions beside trims and fabric swatchesDEVELOPMENT PROCESS VISUAL
ODM FROM A MARKET BRIEF

Your opportunity.
Developed into a product direction.

We translate the audience, target price, launch timing and creative direction into materials, construction and a first-sample plan.

Four decisions before production.

The brief sets the direction. Engineering, sampling, fit and approval close the decisions needed for bulk production.

Pattern pieces arranged over spotted plush fabric in a costume engineering visualDEVELOPMENT PROCESS VISUAL

01Engineer

Resolve pattern and construction.

Pattern, materials, closures and construction route
Sewing detail of an animal-inspired costume sample in a development studio visualDEVELOPMENT PROCESS VISUAL

02Sample

Build the first complete sample.

Prototype construction, trim placement and initial costing
Black cat costume sample being adjusted during a fit review visualDEVELOPMENT PROCESS VISUAL

03Fit & refine

Adjust proportion and performance.

Fit, movement, size balance and sample comments
Two animal-inspired costume samples shown during a final sample review visualDEVELOPMENT PROCESS VISUAL

04Approve

Lock the production reference.

Final sample, packing direction and approved production standard

Working within the approval process.

As a qualified supplier for approved licensed-character programs, PartyTime works to the reference and production standard approved through the customer's or rights holder's authorization process. PartyTime does not own or grant the underlying brand licenses.

BUYER-APPOINTED TESTING & INSPECTION

Report-controlled shipment.

For major-customer programs, the buyer appoints Intertek (ITS) for required physical and chemical testing, together with mid-production and final inspection. Final inspection proceeds only after the required test report has passed. PartyTime releases the order for shipment only after the final inspection report has passed.

  1. 01

    Requirements confirmed

    The customer program defines the required tests and inspection path for the order.

  2. 02

    ITS testing & mid-production inspection

    Buyer-appointed Intertek (ITS) carries out the required physical and chemical testing and bulk-production inspection.

  3. 03

    Final inspection

    Final inspection proceeds only after the required test report has passed.

  4. 04

    Shipment release

    PartyTime releases the order for shipment only after the final inspection report has passed.

Details, when you need them.

Send the brief. Let's define the development path.

The most useful starting points are category, market, expected quantity, target price, size range and launch date.

Send a project brief
Start a project